Automated Cigarette Lighter Bottom Inlet Valve Ultrasonic Welding Machine

Automated Cigarette Lighter Bottom Inlet Valve Ultrasonic Welding Machine

Automated Cigarette Lighter Bottom Inlet Valve Ultrasonic Welding Machine ·The machine adopts PLC programmable control system, which facilitates the function adjustment and the technology promotion. ·Automatically loading materials, welding the bottom air admission valve with the Ultrasonic...

Product Details

Automated  Cigarette Lighter Bottom Inlet Valve Ultrasonic Welding Machine 


·The machine adopts PLC programmable control system, which facilitates the function adjustment and the technology promotion.

·Automatically loading materials, welding the bottom air admission valve with the Ultrasonic technology.

·Automatic alarming system can report irregular issues and giving the corresponding solution, it inducts the incoming materials automatically and point out the lack of materials, predict and record the capacity etc.


Machine specification

Model

ZEUEE-LT-02

Capacity

150-200pcs/min

Power Supply

AC220V 50Hz

Pressure

0.5Mpa±0.1

Weight

470KG

Size

1300 (L) *1500 (W) *1500 (H) MM

The machines is customized, would you please kindly send your technical requirments to get a free corresponding proposal for your product. 


Service:

* Design&manufacture service and support  

* Quality Guarantee Service 

* Product life-long maintenance services

* Deadline Maintenance Service

* After-sales service provided: Engineers available to service machinery overseas

* Telephone hotline about techniques /Online Service

* Customers can not only order our equipments by sending us samples and coming up with requirements but also ask our professional technicians to design the machines according to your needs. It can be very flexible.


图片2 service.jpg


FAQ             

1.Are you a trade company or a manufacturer? 

A: We are an ISO, CE approved manufacturer specialized in manufacturing automatic intelligent equipment, deep application industrial robot arm.

2.What is your MOQ?

A: The MOQ is one pc.

3.What is your delivery date?

A: The delivery date is about 90-100 working days after receipt of payment.

4.What is your payment terms?

A: 50% deposit in advance and 50% balance before shipment.

5:Does the products have CE certificate?

A:Yes, we can offer the CE certificated for you as to your requirements.


Packaging And shipping

The machine will be coated of the anti-rust oil, wrapped plastic wrap around by plastic wrap and polyethylene foamed film, packaged with standard export wooden cases. Our products could be shipped by Sea, by Air. Which methods to be used is based on the consideration of customer's requirements.


图片6 Packaging And shipping.jpg

Inquiry